| Plant Audit for optimisation /
balancing / benchmarking Aditya Birla Group of CompaniesTo add value to plant operations and address all inter-related
issues in the four cement plants (8 kilns) of Aditya Birla Group viz. Aditya Cement,
Grasim Cement, Rajashree Cement and Vikram Cement an integrated assignment of performance
assessment was carried out.

Salient Features
Performance assessment for all the unit companies of the
group
Identified areas for capacity enhancement of upto 27% and
12% with and without incremental investment, respectively.
The energy balance was carried out to identify areas for
savings upto 10% in power and upto 15% in fuel
Bench marking of technical design / capacity data like heat
and power consumption
|
Objective
- To assess plant facilities for better capacity utilization
and optimization
- To identify potential areas for energy conservation
- To bench mark the technical design and capacity data
- To assist Entrepreneurs/Financial Institutions to take
investment decisions
Methodology Adopted
Multifunctional team of specialists conducted series of the
plant visits for on the spot assessment, process measurements and interaction with the
plant personnel
Assessment of potential of various equipment
Formulation of recommendations for improvement measures of
plant operations on short term and long term basis with financial implications without any
investment, with minor investment and with major investment
Estimation of time required for implementing various
recommendations and interlinking them with the existing equipment
Scope of Consulting Services
Technical Assessment of the plant for enhancing output and
improving productivity of the specific unit operations
Short term and long term measures for Rehabilitation /
Improvement
Capital Investments estimation and Implementation schedules
Bench marking of technical design / capacity data like heat
and power consumption
Inter/Intra-firm comparison of performance parameters
|