Home | Back

Clinker Formation

Grasim Cement Project

Accolades

Delivery Method

Engineering Consultant

Project

Grasim Industries
Cement Div.: South
0.8 mio tpa plant
at Reddipalayam,
Perambulur district,
Tamil Nadu

Owner

Grasim Industries Ltd

Main Machinery

Fuller India/ Fuller USA

Loesche India/ Loesche Germany

CIMMCO Birla/ KHD Germany

Completion Date

April 2000

Project Cost

INR 3,000 Million

Coal Stockpile
Coal Stockpile

Plant Overview
Plant Overview

Holtec Consulting Pvt Ltd, under contract to Grasim Industries Ltd., were responsible for detailed engineering and project management of the 0.8 mio tpa cement plant, installed at Reddipalayam, Perambulur district, Tamil Nadu

As project engineers Holtec performed the following work within 18 month project schedule.

  • Basic engineering for the plant from process technological considerations.
  • Procurement of plant machinery and equipment under shopping mode (involving total of 27 packages)
  • Procurement of services for construction and erection (involving total of 6 packages).
  • Detailed engineering for the project encompassing civil, mechanical, electrical and control & instrumentation disciplines. Holtec released over 1000 drg's and processed over 2000 drgs from various suppliers for the project.
  • Provide designer's supervision during construction, erection, trial runs and commissioning phases.
  • Project management of entire project covering procurement, expediting, construction and trial phases.

Kiln and Preheater
Kiln and Preheater

Project Brief

Crusher

:

450 tph

:

Impactor Single stage

Raw Mill

:

170 tph

:

LM 35.4 VRM

Raw Meal Silo

:

10,000 t

:

IBAU Design

Preheater

:

2,400 tpd

:

Four stage

Kiln

:

2,400 tpd

:

3.75 m dia. x 57 m Lg.

Cooler

:

2,400 tpd

:

CIS/CFG

Coal Mill

:

24 tph

:

LM 21.2 VRM

Clinker Silo

:

40,000 t

:

RCC

Cement mill

:

1x134 tph

:

HPGR/ Ball Mill

Cement Silo

:

1x15,000 t

:

4 Compartment, RCC

Packer

:

2x90 tph

:

Electronic, located under Cement silo

Salient Points

  • Most Energy Efficient Plant in India with power consumption of 70kwh per ton of OPC
  • High level automation for Plant Quality Control system with automated sample collection for raw materials, clinker, coal and cement followed by testing by robot (Robolab) for on-line quality control of product
  • 4 compartment cement silo for storage of different types of cement
  • Plant designed with operation on 100% lignite. Suitable for operation with 100% coal or any ratio of coal & lignite