COMPUTER AIDED DEPOSIT EVALUATION (CADE) AND QUARRY SCHEDULING OPTIMISATION (QSO)


1.5 mio tons per annum Aditya Cement at Shambhupura, Rajasthan, India

Aditya Cement with 1.5 mio tons per annum capacity is a major cement producing unit of Grasim Industries Limited (GIL). With the total installed capacity of nearly 10 mio tons per annum, GIL is one of the major players in Indian cement industry. It is part of Birla Group, a leading business group of India having diverse business interests.

Owner

Grasim Industries Ltd.

Consultant

Holtec Consulting Private Limited, India

Key Project Data

Total ML Area

7.6 Sq. Km.

Area Evaluated

7.2 Sq. Km.

Total Drilling

6909m.

Core Drilling

3985m.

Core-Cum-Sludge Drilling

1252m.

DTH Drilling

1673m.

Sampling and Analysis

TC/MC

5581 Nos.

Composite (Major/ Minor Oxides)

4222 Nos.

Blocks (50 x 50 x 9 m)

15712 Nos.

Benches

6 Nos.

Reject Ratio

0.36

Raw mix Parameters

Lime Saturation Factor

96-98

Silica Ratio

2.2-2.4

Alumina Ratio

0.84-0.86

Deposit Life

137 Years

wpeE.jpg (18719 bytes)

Objective of Consulting Services

Preparation of Deposit Block Model of Sambhupura Limestone Mines to maximise deposit life and establish optimal and cost effective mining pattern for meeting the plant requirements.

Scope of Consulting Services

  • Review of detailed geological investigation results including topographical survey, geological mapping, core/DTH drilling, sampling and chemical analysis
  • Preparation of drill hole database from prospecting data
  • Preparation of deposit block model for the total deposit and most potential block, BLOCK-A separately
  • Establishing optimum mining parameters in terms of Lime Saturation Factor, Silica Ratio and Alumina Ratio
  • Implementation of the deposit model at site
  • Preparation of mining plan for the total life of mine, and 10 year plans for the total life of mine.
  • Preparation of practical 5 yearly, yearly and quarterly plans for first 5 years
  • Identification of resource requirement
  • Finalisation of sump area in the pit
  • Reject handling and dumping

Salient Features

  • The implementation of CADE & QSO resulted into substantial increase in reserves and decrease in cost of exploitation
12 similar comprehensive assignments executed. Total 150 raw material management assignments executed.